Under: The People's Committee of Con Dao District Port's location:
1. Ben Dam - Con Dao Terminal:
08°39'00"N - 106°33'00"E
Pilot boarding position: 08°40'30"N - 106°32'42"E
2. Con Dao - Vung Tau Terminal:
10°24'40"N - 107°07'30"E
Office: Management board of Ben Dam - Con Dao Vung Tau Port:
1007/36 str., Ward 11, Vung Tau city, Ba Ria - Vung Tau province
Tel: (84.64) 621048 - Fax: (84.64) 621047
Email: bqlcbd-hcd@hcm.vnn.vn
Mr. Đinh Quang Đông
2.Management:
Director
Mr. Đinh Quang Đong Tel: 84.64.621042
Vice Director
Mr Pham Nhu The Tel: 84.64.830050
Vice Director
Mr Le Xuan Huy Tel: 84.64.625309
3. Access channel:
Ben Dam-Con Dao Terminal:
Length: 1,3km
Channel depth: -12m
Tidal regime: semi-diurnal
Average tidal range: 3m
Max. draft: 9.5m
Maximum size of vessel accepted: 2,000 DWT
Con Dao - Vung Tau Terminal:
Length: 14km
Channel depth: -9m
Tidal regime: semi-diurnal
Average tidal range: 3.8m
Max. draft: 7m
Maximum size of vessel accepted: 2,000 DWT
4. Berth facilities:
Name/No.
Length (m)
Depth alongside(m)
Vessel/Cargoe
Ben Dam wharf 2000 WDT
82
12.0
Cargo vessel and cruise
Ben Dam wharf 500 DWT
150
5.5
Con Dao tourist berth
30
2.5
Con Dao-Vung Tau terminal
110
5.0
5. Storage facilities:
Ben Dam - Con Dao Terminal:
Total area: 24,000m2
of wich 5,725m2 open storage
Con Dao-Vung Tau Terminal:
Total area: 20,300m2
of wich 500m2 of warehouse
6. Major equipment:
Type
No.
Capacity
Shore crane
2
5~25 MT
Forklift
2
2.5 MT
Transport vessel
2
2,200 HP
Canoe
2
12HP & 90HP
Excavaror
2
1~2 m3
7. Cargo throughput:
2003
2004
2005
2006
2007
Total
85,000 MT
156,000 MT
204,290 MT
236,417 MT
224,350 MT
Import
5,000 MT
0
0
0
Export
nil
0
0
0
Domestic
80,000 MT
156,000 MT
204,290 MT
236,417 MT
224,350 MT
Ship calls
7,525
include 122 cargo vessels and 6,004 off-shore fishing boats
221 including 122 cargo vessels and 3,437 off-shore fishing boats
302
314
8. Kế hoạch phát triển:
Project
Total cost of investment
Implementation
Upgrading Con Dao-Vung Tau Terminal
VND 33.5 billion
2008-2009
Construction of 300T cold storage at Ben Dam-Con Dao Terminal
VND 8 billion
2008
Construction of 3.2ha yards/warehouses at Ben Dam-Con Dao Terminal
VND 23 billion
2008-2009
Rehabilitation and upgrading of Con Dao Tourist Berth
VND 58 billion
2008-2010
Project of anchorage zone for storm sheltering
VND 100 billion
2008-2010
9. Main services:
- Stevedoring, leasing means of handling transport, supply of fishing logistics and passenger services,...