Ben Nghe Port
| BEN NGHE PORT |
| 1. Name and Address |
|
Port's name: BEN NGHE PORT LIMITED COMPANY
Under: SAMCO
Port's location: 10°45'45"N - 106°44'00"E
Pilot boarding position: 10°20'N - 107°03'E
Address: Ben Nghe Str., Tan Thuan Dong ward, district 7, Ho Chi Minh city
Tels. No.: 84.8.8723316 / 8723317
Fax No.: 84.8.8728383
E-mail: benngheport@hcm.fpt.vn
Website: www.benngheport.com
|

Mr. NGUYEN TRONG CUU
|
| 2. Management |
|
Director General
|
Mr. NGUYEN TRONG CUU
Tel: 84.8.8722075
|
|
Deputy D.G. for Engineering
|
Mr. TRAN HOA LAN
Tel: (84.8) 8728284
|
|
| 3. Access channel: |
Length 84 km.
Depth: -8.5 m.
Tidal regime: irregular semi-diurnal.
Average tidal range: 2.7 m.
Draft: -11.0m.
Maximum size of vessel accepted: 36,000 DWT
|
| 4. Berths : 7 buoy berths, 6.5~9.5m deep |
|
Name/No
|
Length (m)
|
Depth (m)
|
Vessel/Cargo
|
|
K14
|
88 |
-7,5 |
5.000DWT
|
|
K15
|
265 |
- 9.5 |
10.000-20.000DWT
|
|
K15B
|
175 |
-11.5 |
36,000 DWT
|
|
K15C
|
288 |
-13.0 |
36.000DWT
|
|
| 5. Storage |
Total port area: 320,000 m2
Warehouse/shed: 11,520 m2.
Open storage: 200,000 m2
Total storage capacity: 550,000 MT |
| 6. Equipments |
|
Type
|
No.
|
Capacity
|
| Quayside gantry crane |
2 |
40 MT |
| Harbour mobile crane |
3 |
64 & 104 MT |
| Rubber-tyred crane |
3 |
20 ~ 30 MT |
| Forklift/toplift/reachstacker |
27 |
2 ~ 42 MT |
| Tractor with trailer, and truck |
13 |
10 ~ 13 MT |
|
| 7. Cargo throughput: |
| |
2002 |
2003 |
2004 |
2005 |
2006 |
2007 |
| Total |
2,700,000 MT |
3,002,584 MT |
3,170,000 MT |
3,384,000 MT |
3,680,000 MT |
4,059,990 MT |
| Import |
2,149,000 MT |
2,037,177 MT |
1,400,000 MT |
1,468,000 MT |
1,033,000 MT |
998,486 MT |
| Export |
372,000 MT |
605,168 MT |
700,000 MT |
454,000 MT |
223,000 MT |
180,531 MT |
| Domestic |
179,000 MT |
360,239 MT |
1,070,000 MT |
1,462,000 MT |
2,424,000 MT |
2,880,973 MT |
| Container |
77,698 TEUs |
88,911 TEUs |
129,045 TEUs |
163,810 TEUs |
191,048 TEUs
|
218,004 TEUs
|
| Ship calls |
718 |
672 |
754 |
919 |
797 |
760 |
|
8. Development Plans
|
| |
|
Project
|
Total cost of investment
|
Implementation
|
| Purchase of 4 rubber-tyred gantry cranes |
VND 40 billion |
2009
|
| Port upgrading and expanding, phase III |
|
2005-2009
|
| Construction of Phu Huu Port, district 9, HCMC |
|
2007-2009
|
|
|
|
9. Main activities services
Cargo handling, tallying, warehousing, container stuffing/unstuffing, bagging.
Container transhipment services, bonded warehouse rental, and ICD operations
|
| 10. Computer system |
85 PCs and 4 servers applied in port operations and management.
| LAYOUT |
 |
|
|